Monday, 15 April 2013

Early April Update

We have had a busy weekend at Albert House, Dael and Liam got stuck in and have made very good progress in finishing plaster boarding the top floor rooms, another session at this this week and I would say we are ready for the plasterer to do his magic the coming weekend. Every time I go up to the top floor I am amazed at how much natural light we have created by installing Velux windows, you really have to take a step back and look at the old photographs to see the transformation, imagination is one thing but the reality is even better.
Once we get the rooms plastered we can complete the finishing, by this I mean new grey electrical sockets which will be the metal " industrial type" with cable run in black metal conduit to give the rooms/ offices the masculine look I think a modern office space should be. We also have to sand down the exposed beams to give the rooms character and beauty which will complement the new work fantastically well. We will then be in a position to apply a base paint and then decide the final colour scheme and room layout, I think in the next month we should be complete and ready for furniture selection, along with goodness knows what IT equipment to support the Business needs of a modern world.

Work has also continued a the first floor with her Ladyship grasping the nettle and getting stuck into sanding down the remaining door frames ready for painting, I have to say her enthusiasm cannot be overstated, this is not light easy work, anyone who is willing to learn how to use ferocious power tools such as angle grinders and power drills with grinding attachments has to be admired, she loves it! not only that, she is very competent with these potentially dangerous, heavy and noisy pieces of equipment!

We have also made good progress this weekend in finishing three bedroom doors ready to be re-fitted, you may recall that sometime ago we removed the doors and had them chemically stripped, well, that is only the start. We set up one room for the preparation and sanding operations, and another room to complete the finishing process, this meant keeping as much wood dust in one room and another dust free room for cleaning and staining the doors.
Initially in room 1, we have to fill in any holes or imperfections with wood filler, then sand all the surfaces with 80 grit paper followed by 180 grit and then finish with 240 grit (the smoothest), I think I managed to use just about every tool I have available for this task, belt sander, orbital sander, various detail sanders and a Dremmel to get into the corners, so you can imagine the time and care this needs.(the orbital sander is my personal favourite).
  Then into room 2, before staining we have to have a dust free surface, we did this firstly by soft brushing any loose dust off the surface and then a cleaning with white spirit soaked in a rag, I have also read that you can wipe the surface with a "tacking cloth" to remove the last fine dust particles but I am not familiar with this technique and we do not have any!! when I next visit the DIY shop I will look out for this and give it a go, we have plenty of doors to go at!
At the end of this fine weekend we have managed to prepare the 3 doors and apply two coats of dark walnut stain to one of them and I have to say so far, it is looking good.
        





FIRST COAT


Friday, 5 April 2013

Just Daydreaming

It is surprising how motivating it is after the previous weekends good solid efforts by everyone in getting two rooms decorated, it feels to me like a major step closer to completion. Now we have the wind in our sails we need to press on and get these two rooms finished, firstly the doors which have previously been chemically stripped and are ready for a fine sanding and then staining, all the doors will be fitted with new hinges, locks and probably crystal door handles, I`m not talking about "doing up" the old fixtures but sourcing new reproduction items. This is a good example of the sort of task that I particularly enjoy, mixing contemporary fixings with the beautifully crafted solid doors that have stood the test of time, it was always the plan for this refurbishment to keep as much as possible of the original and complement with modern materials which would not have been available way back in 1871. Hopefully during the next week we will have two doors completed and I will be able to share the photographs on this blog. 

When I find myself in this upbeat mood I occasionally allow myself to think of how the finished project will be, this week my thoughts turned to the "Big Boys Room or Gentleman's Room", I keep changing my mind of how this will be, for example is it Modern? Retro? Gentleman's club? My thoughts now are a classic cocktail bar look, with a white baby grand piano in the corner.
This one of my favourite classic pieces, Canon Suite by Pachelbel, have a listen to this and let me know what you think.      



Wednesday, 3 April 2013

Easter Weekend

Easter is here earlier than usual, I have had 4 days holiday so it was  good opportunity to have a clear run at getting some jobs done without having to stop and start. Liam and Daels bedrooms have been a major focus of late with both of them at a stage where some final painting could be carried out. On Saturday, her ladyship and Adon were despatched on a mission to source the paint, brushes, rollers, trays and radiator paint, with a clear brief from the boys of what the colour scheme should be, blue and grey for Dael, mustard and a grey for Liam. 
Later that day the mission to paint commenced starting with Daels room, starting with a finish white coat on the ceiling and coving and then onto the walls with cutting in with a brush followed by 2 coats of emulsion, the blue was perfect and brings out the white of the the decorative coving and ceiling, however the grey was thought to be a little on the dark side so a a quick mix with white toned the effect down to a more pleasing finish giving a real modern feel to the room. The door frames were sanded utilising almost every power tool in my armoury to get the finish we required ready to accept the wood prime coat, I have to say this is time consuming and requires a great deal of patience getting into the decorative woodwork but well worth it when you see the final result, brilliant white complementing the rich colour scheme of blue, grey and dark walnut skirting.
Liams room was the same, a finish coat on the ceiling and then onto the colours, very brave to choose mustard and the darker grey, but again it works, a contemporary look in an old house, quite stunning really. Again the door frames were completed with patience and care, and again looking good painted white, we still have to finish with high gloss paint which will give the finishing touches to these beautiful rooms.
Nobody has yet decided on what type of radiator will complement their respective rooms (I don`t think they`ve even looked!) so for now the existing radiators will have a spray coating of gloss white radiator enamel.
What will the carpet be? 















Friday, 29 March 2013

Rub a Dub Dub

For the past few weeks her ladyship has continued with quest to remove every last bit of paint from the staircase woodwork, this includes not only the numerous spindles but the whole beautiful wooden structure of the stairs and hallway. This task cannot be underestimated, so far, it has taken 4 heat guns, 10 scrapers, 2 tins of chemical stripper and 2 wire brushes just to get to the stage ready for sanding.
I think we can safely say that the best way by far of removing numerous layers of old paint is by heat gun and scraper, her ladyship has perfected the technique of heating the paint to a plastic state where all the layers of the old paint "easily" peel away from the wood in one scrape, the paint peelings then fall to the floor, solidify and become brittle ready to be swept up.
 I think we can also safely say that chemical stripper is next to useless, the stuff does not work on the paintwork we are dealing with!
Whilst the task so far has consumed many hours of sheer determination and patience we have to go over the woodwork again with sand paper to get the wood back to its original state. This will be done with power tools, over the last few months we have amassed quite an impressive array of tools specifically for this, we have belt sanders, orbital sanders, detail sanders, sheet sanders, disc sanders, angle grinders, all shapes and sizes of palm sanders not to mention every size and type of wire brush attachments for power drills. So with more patience and determination we can prepare for the next step which will be stain or paint?        
  

Sunday, 24 March 2013

Marching on into Spring

Well, here we are in late March, Spring is officially here and we can look forward to lighter evenings and warmer days, the time of year where we all look forward to blue skies and dare I think it, outdoor living with a barbecue in the garden.
That is what you would think at the start of Spring time but this year the reality is somewhat different. As I am writing this blog on a Spring Sunday morning, looking out of the window I see everything covered in 200mm of snow! yes snow, deep snow and I have to take Jack (the dog) out for a long walk soon, phew whats going on here.
 I have listened for years about global warming and we have this? not quite what I was led to believe the effects of global warming were going to be, I have been planning growing a grape vine over a Pergola and tomatoes in the garden without a greenhouse, this seems so unlikely as we are nearly in April and its freezing!
Anyway, enough of the waffling about the weather it`s about time I gave you an update on the good progress to date.
Starting with the master bedroom where Liam has been applying his artistic talents by giving the room a base white paint coat which as I may have said before brightens up the room so you are able to get a better idea of the proportions and how the final layout will be, he has also painstakingly removed all traces of old paint from the window and door surrounds ready for the final decision of stain or paint? the jury is still out.
For the past few weeks much of the refurbishment attention has been on the 3rd floor rooms, after the shock of Dael and Liam stripping the rooms of all the original lath and plasterwork and removing all unnecessary false walls and cupboards, work has been focused on rebuilding, where after re-torching the roof tiles we have taken the opportunity to install Kingspan insulation boards under the rafters before covering with foil backed plaster board, and fibreglass type insulation into any accessible roof spaces. This work is now almost complete in readiness for the finishing plaster skim coat. I have to say there is already a noticeable difference in temperature on the 3rd floor even though we have temporarily remove one of the radiators.
You now start to get a picture of how these rooms will be when finished, these will be well insulated modern spaces without clutter and exposed wooden beams dividing the rooms giving a greater sense of space and modern living.           

Thursday, 14 February 2013

An Interesting Observation

Albert House Marble and Stone Pillar 1871
St. Pancras Marble and Stone Pillars c1860`s

Cast Iron Newel Post

Wooah! We are quite excited about finding something we didn`t know we had, some people may think "so what", but to me finding that we have uncovered an original intricate Victorian cast iron product under our noses is as good as it gets!
You see, during the stair paint stripping process her ladyship was working on the Newel post and was having difficulty getting it back to bare wood when it suddenly dawned on her that this post was not like the spindles, she was finding it very hard to scrape and under the paint it was very dark in colour? Further investigation revealed that the post in fact was metal! So, with angle grinder at the ready we set about with a wire brush attachment and started to remove the paint, little by little we started to uncover a beautifully intricate metal Newel post, the detail is amazing, and this has been covered up for years with layers of paint, onwards as we now need to get this back to bare metal and restore it to it`s former glory, a real beautiful piece of iron work to catch the eye as you enter the house from the front door, just as it would have been when new in 1871.
It was during this time period we loosely call the Industrial Revolution era that iron casting became a prominent style, Foundrymen had mastered the art of casting liquid iron into sand moulds in thinner, lighter shapes and designs, cast iron was relatively cheap, widely available the became the number one choice in elaborate architectural designs of the period over traditional stone carvings, iron castings were certainly much less expensive than Brass castings and modern steel had not yet been developed.
We can see all around us evidence of ironwork used at this time from ornate garden railings to the beautiful architecture of St Pancras railway station built in the same time period.
Britain pioneered the Industrial Revolution in the 18th and 19th centuries when new production methods led to cast iron being produced more economically and had enough manufacturing capacity and capability to allow iron to be used in more and more large scale projects such as the first cast iron bridge built during the 1770`s in Shropshire by Abraham Darby, still standing to this day.
I could waffle on for an eternity about the development of iron casting but perhaps that the subject of another blog.......



first attempt at the Newel post
 

St. Pancras station iron work

  

Wednesday, 13 February 2013

One Step Forward Two Steps Back!

I thought it was time for an update on the ongoing activity on Albert House, things seem to have been a little slow during January and February and it sometimes feels like one step forward and two steps back as we seem to make an action plan then as work starts we find we need to change tact as we come up against some unforeseen event, but I suppose that can be expected really as we are carrying out a full and complete renovation and have always said we need to do this beautiful house justice and not cut corners, so if something needs doing it has to be done whatever the work commitment and cost.

A typical case in point has been the two 3rd floor rooms which will eventually be offices for the family`s business activities, this started off as a simple re-wire to move the existing side lit spot lights to central pendant type lighting, and then strip off the old white painted wallpaper and re-plaster, nice and simple upgrade you would think! well, think again, the scenario goes something like this..... work starts with paper stripping with the steamer, as the paper starts to taken off we find areas of loose and crumbling plaster, not a concern, keep stripping and we can make good any inconveniences of crumbling plasterwork, after all underneath is good solid laths. Well it would appear to be not so simple, one day I arrive at the house to be greeted with "the old plaster was worse than we originally thought so we decided to take it all off, including the laths because this would be too difficult to re-plaster, so now we are going to plaster board it and skim, ok"? Actually yes it was ok because we have now completely taken these rooms back to brickwork and exposed joists which in turn has allowed us to add two new Velux windows, which have transformed the rooms by significantly increasing the natural light, we have re-torched the roof tiles and insulated the whole room with Kingspan foam insulation which undoubtedly will reduce heating fuel consumption and improve our carbon footprint, so, as well as doing our bit for the environment we are bringing the house up to modern standards. As there is no roofing felt on these old houses we have put the insulation boards under the joists to maintain a 75mm air gap between the tiles and the ceiling to allow the roof space to "breathe", the final plaster boarding will be 12.5mm Duplex type to further reduce heat loss and avoid any cold spots.
We have also taken the opportunity to remove all the original cupboard type spaces which you find in these period properties and managed to increase the floor space by a whopping 10m2! now that was worth doing, so, here we are in February with two rooms nearly put back together and how different they will be to the original.
just like a Victorian, home from school and set to work!

Monday, 21 January 2013

A Few Pictures of Starting to Paint

Yes, it`s snowing

Yes, it is snowing in January. The old saying that a snow covering makes my garden look as good as everyone else`s is certainly true here, the ugly grey paving slabs are now gleaming white snow!

But whilst the snow has been falling we have been inside a nice warm house continuing with the renovation project, I am pleased to tell you that we have been making slow but very satisfactory progress over the last few weeks. We now have the staircase re plastered from the hallway reception right the way to the top of the stairs on the third floor, the first undercoat of white has been applied downstairs, this certainly brightens the place up after weeks of dull old plaster, you get a nice feeling of homeliness as the interior becomes brighter by the day.
One of the next important jobs is to re-install the reception hall radiator, her Ladyship has been painstakingly paint stripping skirting boards and understairs and is complaining of cold and draughts hindering her output, as a halfway solution to her problem I rescued an original door and re-fitted it back to it`s original position which separates the hall walkway from the rear of the house and the draughty back door, this gave an immediate improvement to her working conditions!  this door was removed some years ago to improve access for the nursery children , fortunately at the time we did not dispose of the door, for some reason we kept it and stored in the cellar. Again, this is another example of the house is becoming more homely, although at the moment the door is painted bright yellow it will look really beautiful when it has been stripped back to bare wood and protected.
  

Tuesday, 4 December 2012

It`s Christmas Time

Well, December is upon us again and Christmas time is just around the corner, back in June we had rather optimistically aimed to be spending Christmas in our Victorian house, mmm we seem to have been wildly wrong in our estimation of the refurbishment programme. Nevertheless, we continue to move forward each and every week and can now report that finally the re-plastering has reached the ground floor with the staircase completed, I am sure with some extra effort the upstairs can be in some way habitable in the very near future.
So, our plans of Christmas in Albert House will have to be for next year and hopefully it will be a good old fashioned Victorian themed affair, a Dickensian extravaganza with snow falling outside and family arriving with the sound of fresh snow crunching under their boots, the Christmas tree has to be a floor to ceiling beauty just as it would have been when Prince Albert introduced this tradition during the 1800`s, with guests dressed in a Victorian fashion and invited to a glass of Port in front of a crackling log fire as Christmas carols play in the background and the traditional Christmas roast Goose is well underway.
The reality this year will be more like me being the character Bob Cratchit in Charles Dickens 1843 novel "A Christmas Carol", you know, the poor bloke who Scrooge never lets have a day off, well that's me this year!
So perhaps we have to look forward to the New Year, perhaps a James Bond themed evening where the dress code is strictly Black Tie, I`m not talking fancy dress but the full blown formal dinner suit. Nothing beats the understated beauty of a classic Tuxedo, a work of art, the jacket has to be single-breasted, one silk covered button with pure silk peak lapels, and always kept buttoned, jetted pockets and definitely no flaps. Finished off with a white crisp linen or silk handkerchief in the top pocket.
Trousers should be worn higher than normal on the waist, flat fronted with silk down the sides and plain bottoms, preferably held up with buttoned braces.
The shirt has to be a crisp white with a fly front or studs, nothing too fancy but I do like wing collars to show off the black silk bow tie, and of course the classic cuff links are essential.
 Personally I`m not a fan of the cummerbund I think it more suited to Jack Sparrow or a Matador. Finally, finish off with red socks and a pair of slip on black patent shoes.
James Bond indeed, get ready to give the liver a good kick-in!

Wednesday, 21 November 2012

Marching on through November

November has arrived and the weather remains mild, I thought it would be much colder by now so the central heating has been switched on to keep the house warm. I have to say this has not been as straightforward as you might imagine, you see, we had removed several radiators to enable the plasterer to do his work, we re-fitted the radiators but have had to bleed and adjust valve settings numerous times to get the system balancing correct, I think there is still work to do to get the heat distribution correct but I will deal with this after all the business of radiator on and off for plastering and decoration has been finalised. At least we have a warm house.
  During the last couple of weeks the plasterer has been doing his magic, I have to say this really is an art getting old walls to look like new and perfectly smooth, so far he has completed some new boarding and preparation work and has started to spread the new stuff, we have several walls on the landing areas completed including the beautifully curved wall on the first floor which is a massive relief as we thought this might have been problematic to retain the shape.
As fast as the plaster works we are trying to keep in front of him by updating the electrics, such as new  sockets and wall lights in the hallway, so far we have managed to get the cable run cut outs completed for the wall lights and new wiring, I do think sometimes what would we do without power tools, particularly the SDS drill and chiselling attachment which with very little effort cuts out perfectly 30mm wide by the 25mm of old plaster ready for the wiring. The next job this week will be to drop a supply from the hallway ceiling light which we have accessed through the first floor floorboards, fortunately the lighting circuit is of the junction box type which makes the job a little bit easier to connect to and then run the new cable through the floor and into the wall. 
You will see from the phoptgraph that whilst cutting out for the cabling we came across loads of old redundant cables buried into the wall, there are two editions here which I will do some reasearch on at a later date, there apperars to be the original single wire type in metal conduit and another version which looks like modern wires but in a lead sheath? as opposed to the modern variant of 2 core and earth in a plastic sheath, it would appear that all these cables came together here into an old type of fuse box which is a little strange as the unit would be 3m above the floor level?


large cut out where the old fuse box used to be
new cut outs for wall light and switch

Monday, 12 November 2012

Master Bedroom

We have just realised that the enormous task of paper stripping is 95% complete! the only outstanding room to deal with is the "Boys Room" and this cannot be done yet as it is currently being used for storage. Paper stripping is not exactly an easy or pleasant job so I think "An Awful Lot of Effort" has gone into preparing the walls and ceilings for re-plastering, a job very well done by you all!

This weekend has been primarily spent on two tasks, one being making a door frame for access into the loft space and the second, her Ladyship has been hard at it stripping paint from the window frame in the master bedroom, again, not an easy or pleasant task but as in Daels room the wooden surrounds when stripped back are beautiful and will be a real feature when completed. What would we do without electric heat guns, power sanders and of course determination?
 I wonder if originally the surrounds were bare wood or painted from the outset?


Friday, 9 November 2012

Plastering time is close

Having decided to open up the second floor hallway ceiling we now have a 5m high ceiling which is currently being re-boarded following inserting foam insulation boards between the flat roof joists. The lighting wiring has been extended and re-positioned ready for an impressive 3m long chandelier, this will be a real focal point in the house, but before that the whole area now needs plastering which hopefully will be started this weekend.
I have to say Dael and Liam`s idea to fully open this area up was the correct one, the expanse is impressive to say the least and gives the house a grand appearance which it deserves. Why the original design had a "built in box" over the stairs just to provide a crawl through door to access the loft space is beyond me, our idea to make a loft entrance with a full height door through one of the 3rd floor rooms looks to be a much improved solution.
At a later date perhaps when the weather is warmer we will look at the installation of the dome or roof lantern in this area which will give the home a real wow factor in addition to letting in more natural light.

Bonfire time

We had bonfires on both the 4th and 5th this year, lats lats and more lats to burn after a mammoth demolition session of old lath and plasterwork ready for the new boards.


Friday, 2 November 2012

Roof Lantern or Dome?

This week has been decision time as to whether we open up the top floor ceiling to allow a roof lantern or dome to be fitted on the flat roof part of the house.
We had previously thought about how good a roof lantern or glass dome would add to the beauty of the house notwithstanding the amount of natural light it would allow to flood through from the third floor right down to the hallway, but we put it to the back of our minds as we pushed to prioritise other elements of the build, like plastering, wood work and electrics.
However, this week as Dael and Liam were preparing the third floor ceiling they decided it would be better to remove the old lath and plaster ceiling and re-board with Gypsum plaster boards and skim, well, this exposed the area through the loft to the central flat roof area which then led to talk of "whilst we are doing this we might as well take the boarding right up to the roof ready for a lantern or dome". Nice idea and with a couple of days work the area could be transformed into a very high ceiling open space, so, decision made "lets do it, and whilst we are doing that we may as well take out the ugly loft access area box and make a new access area from a third floor room", mmm more than a couple of days work now I think!
I am sure this is the way to proceed by opening up spaces and providing more natural light, as I have said previously the Victorians did have a preposition for making unneccessary dimly lit areas and lots of boxing in, the one thing we wanted to achieve with this refurbishment is to improve on their designs by opening up areas where we could and utilising more natural light.
  

Friday, 26 October 2012

Updating the Electrics

As the paper stripping continues from the top floor down there has been an opportunity to update the house electrics, by this I mean making the lights on each of the three floors 2 way switching. When the house was rewired in the 1990`s the electricians at the time failed to make it 2 way switching, I can see reasons why, probably the time and cost of chasing cable into and through quite heavy duty walls and plaster.
But, here we are today in October 2012 and the house has to be a home with all the comforts we come to expect, this includes up-to-date compliant electrical services. So, as we are back to bare plaster ready for skimming, we took the opportunity to make the changes to 2 way switching and an additional pendant light on the second floor.
Fortunately in this modern world of ours we are blessed with SDS power tools and purpose made brick and mortar chiseling attachments which take very little time to cut 30mm wide cable runs into 20mm thick old plaster, this completed it was just a case of installing runs of 3 core and earth cable to convert the existing lights into 2 way switching. Another job completed ready for the plasterer to make good again.

cutting out the plaster

utilised original old conduit
found old wiring in conduit

Thursday, 25 October 2012

Another Bedroom

As October marches on progress is being made on what will be Daels room, the paintwork on the door frames and high skirtings has been successfully removed using the tried and tested method of heat gun, followed by numerous electric sander tools designed for this task, funny how everyone seems to have their favourite tool for this operation, the results are again stunning and impressive. The colour of the skirting boards is again to be dark walnut varnish to keep the same theme throughout all the bedrooms, I`m not quite sure just yet what the door frames are going to be, so far they have been taken back to bare wood, perhaps gloss white? one thing for sure is the concensus that the newly stripped doors will be wood stain, it would seem criminal to paint over these beautifully restored pieces of wood.
The outstanding achievement in this room is most definitely the large Gothic window frame, Dael has painstakingly transformed a painted window frame to exposed bare wood, and is quite remarkable to say the least, this room now has a truly beautiful period piece of craftsmanship as a focal point.